projects
J.L. Bray & Son has experience with a wide variety of projects
completed in locations throughout the state of California. Below
you can find a few recent highlights of our work.
![red logo JL Bray logo](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/Embellishment_Red.png)
Featured Projects
More Projects
- All
- commercial
- Design Build
- education
- healthcare
- Lease-Leaseback
![USPS post office](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4002-1024x683.jpg)
Salida Post Office
Structural expansion of existing post office and associated site improvements.
![shade structure school shade structure](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3694-1024x768.jpeg)
Virginia Parks Elementary School – Shade Structure
Erection of student shade structures.
![public restroom sinks row of restroom sinks](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3691-1024x768.jpeg)
Virginia Parks Elementary School – Restrooms
Restroom renovations including ADA upgrades.
![school-entrance school entrance](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4151-1024x683.jpg)
Carroll Fowler Elementary School
Complete hard surface site renovation including new utilities and large storm water collection system.
![CVHS classroom building](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4109-1024x683.jpg)
Central Valley High School – Classroom I
New construction of six-classroom building including science labratories.
![shade structure school shade structure](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4105-1024x683.jpg)
Central Valley High School – Shade Structure Project
Erection of student shade structures.
![construction work construction on a school building](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4860-1024x768.jpeg)
Julien Elementary School
New administrative office building and site security improvements.
![side of building exterior of building](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4138-1024x683.jpg)
Caswell Elementary School
Addition of new 6-classroom building, bus drop off, and associated sitework.
![Exterior of Microtel exterior of hotel](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4147-1024x683.jpg)
Microtel – Ceres CA
Construction of a three-story hotel and site improvements.
![Barn Dunn Barn](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4041-1024x683.jpg)
Dunn Barn
Modern ag. facility utilizing old school construction techniques.
![city tower street view city tower](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3910-1024x683.jpg)
City Towers
Construction of a seven (7) story, steel office building consisting of 53,400sf of executive level office space and three (3) levels of parking.
![Damrell building Damrell building exterior](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3906-1024x683.jpg)
Damrell Building No. 1
Two-story law offices utilizing extensive hard wood trims and cabinetry to provide warm and inviting environment.
![taco Taco Bell](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3952-1024x683.jpg)
Waterford Taco Bell
Waterford Taco Bell
![Fire house Fire station](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3988-1024x683.jpg)
Atwater Fire Department
Construction of a three apparatus bay fire station with a county emergency operations center.
![postal post office](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3939-1024x683.jpg)
Waterford Post Office
Complete devotement and construction of modern postal facility.
![St Luke's St Luke's entrance](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4075-1024x683.jpg)
Saint Luke’s Family Practice
Expansion of medical office practice.
![Pitman High School Pitman High School](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4054-1024x683.jpg)
Pitman High School
Expansion of campus with multiple classroom buildings, continuing the architectural zeal of the original construction.
![kitchen commercial kitchen](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3686-1024x768.jpeg)
Virginia Parks Elementary School – Kitchen
Kitchen renovation on an operational campus.
![school construction construction by playground](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_1974-1-1024x768.jpg)
Frank Sparkes Elementary School
Ground-up construction of a CMU and structural steel multipurpose building, including a full kitchen.
![school school building](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/ag-1024x768.jpg)
Gregori High School
Construction of a complete modern high school agricultural facility.
![flag and building flagpole by building](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4063-1024x683.jpg)
Brown Elementary School
Site improvements and modular relocations. Full campus dry rot repair and interior upgrades.
![Salida Salida Elementary School](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4017-1024x683.jpg)
Salida Elementary School
Site security improvements, ADA compliance, building renovations including window upgrades.
![flag flag pole at front entrance](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4092-1024x683.jpg)
Hughson Elementary School
Modernization of 19 classrooms and ADA restrom modifcations. Removal and replacement of package HVAC units, light fixtures, and interior and exteiror finishes.
![projects-yolo-middle-school-gym Yolo Middle School Gymnasium](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-yolo-middle-school-gym.png?time=1722035825)
Yolo Middle School Gymnasium
New construction of a CMU gymnasium building with a complete athletic apparatus system and classrooms.
![Yolo Bldg building in Yolo](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/Yolo-Bldg-1024x768.png)
Yolo Middle School Classroom Building
New construction of a six-classroom building including a modern art teaching environment as well as associated site work.
![optometrist lobby optometrist waiting area](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4130-1024x683.jpg)
Vision First Optometry
Expansion and renovation of optometrical office.
![projects-virginia-parks-elementary Virginia Parks Elementary School](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-virginia-parks-elementary.png?time=1722035825)
Virginia Parks Elementary School
Complete site developement and construction of an elementary school utilizing wood framed construction and masonry unit veneer.
![barn Dunn barn](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3708-1024x768.jpeg)
Veneman Barn
Custom construction of wood post and beam barn attached to an ultra secure tilt-up storage facility.
![projects-standford-elementary Standiford Elementary School](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-standford-elementary.png?time=1722035825)
Standiford Elementary School
Full campus modernization, reroof, and ADA improvements on an operating campus.
![projects-sam-vaughn-elementary Sam Vaughn Elementary School](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-sam-vaughn-elementary.png?time=1722035825)
Sam Vaughn Elementary School
Full campus construction including office, library, and classroom buildings.
![Salida Salida Union School District](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_3915.png?time=1722035825)
Salida Union School District Office
District office development and construction utilizing underground parking allowing for expansion of the space as needed for multiple tenants.
![projects-merced-county-animal-services Merced County Animal Services Facility](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-merced-county-animal-services.png?time=1722035825)
Merced County Animal Services Facility
Modern animal control facility to assist in relocating small to large breed animals.
![projects-damrell-building damrell building](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-damrell-building.jpg?time=1722035825)
Damrell Building
Ground-up construction of a 5-story class A commercial office building with associated three-story parking structure and phased tentant improvement buildout.
![projects-cleveland-es-modernization Lease-leaseback methods provide financing and progress payments to school.](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-cleveland-es-modernization.png?time=1722035825)
Cleveland Elementary School
Modernization of an existing campus, including landscaping, ADA upgrades, and fire alarm, intrusion and communications.
![projects-ceres-high-school-shops-building Ceres High School Shop Buildings](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-ceres-high-school-shops-building.png?time=1722035825)
Ceres High School Shop Buildings
Renovation of existing buildings into modern ag. and wood shops. Implemented digitally controlled equipment.
![projects-ceres-high-school-expansion Ceres High School Expansion](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-ceres-high-school-expansion.png?time=1722035825)
Ceres High School Expansion
Site infrastructure improvements for modular building construction. Renovation of two existing restroom and ADA modifications to three additional restrooms.
![projects-ceres-community-center Ceres Community Center](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-ceres-community-center.png?time=1722035825)
Ceres Community Center
New 28,000 sf community center with large conference rooms, computer learning center and parks and recreation.
![Central Valley Central Valley HS](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/IMG_4102-1024x683.jpg)
Central Valley High School – Science Building
Structural expansion of existing two-story classroom building with classrooms and science labs.
![projects-bethany-elementary-school bethany school](https://mbcdb7.p3cdn1.secureserver.net/wp-content/uploads/projects-bethany-elementary-school.png?time=1722035825)
Bethany Elementary School
Complete elementary school construction including multipurpose, classroom, library, and office buildings. Project was completed in less than 12 months.